On to the house...
11/30/12
most exciting thing about this day...showers/tub installed. Piping and HVAC almost done too.
Also, windows and doors were installed a few days before too (didn't capture that) on my previous post.
Also, windows and doors were installed a few days before too (didn't capture that) on my previous post.
Elaina in front her of bath tub/shower |
12/4/12
the shingles were started this day (windows and doors)
12/5/12
finishing up the shingles...
The back of the house's shingles almost done. |